N69 Listowel Bypass Proposed Road Development
Works scheduled between July 2022 and Christmas are as below:
Proposed Traffic Management on JBK Road
Phase 1. Works on John B Keane Road between McKennas and Clieveragh Roundabout.
One way traffic E-W between Mckennas and Clieveragh Roundabout. Ballybunnion traffic diverted down Market St (No left turn onto John B Keane Road). Works to commence on the 25th July with this phase being completed for the Races on the 16th September 2022.
Phase 2 – Works on Ballybunnion Road/Market St junction
Phase 2 will commence after the races. Two way traffic between McKennas and Clieveragh Roundabout. One way Traffic in Market St. (N-S). The Contractor has requested Road Closures at the Ballybunion junction in late November to allow surfacing to be completed.
Phase 3 – Works on Ballygologue Junction
At the same time works will be happening on Ballygologue Junction. One way traffic W-E between Clieveragh Roundabout and Ballygologue. The south side of Ballygologue Rd will be closed, with a closure sought from end September to mid – November. The Contractor’s programme has this work scheduled for completion by the end of November.
January 2023 through to June 2023 will see works progress for the remainder of the John B Keane Road. Traffic management for these sections will be finalised in the coming months and having regard to the experience of the works in 2022.
Newsletter – 4th July 2022 (PDF)
Newsletter – JBK Road July 2022 (PDF)
Original Plans and Route Options
- Cover
- Location Plan
- Route Corridor Options and Constraints
- Stage 2 Route Corridor Options
- Identified Preferred Route Corridor Option
- Horizontal Alignment Key Plan
- Horizontal Alignment Vector Background Sheet 1 of 4
- Horizontal Alignment Vector Background Sheet 2 of 4
- Horizontal Alignment Vector Background Sheet 3 of 4
- Horizontal Alignment Vector Background Sheet 4 of 4
- Horizontal Alignment Aerial Photo Background Sheet 1 of 4
- Horizontal Alignment Aerial Photo Background Sheet 2 of 4
- Horizontal Alignment Aerial Photo Background Sheet 3 of 4
- Horizontal Alignment Aerial Photo Background Sheet 4 of 4
- Photomontages
- Environmental Impact Statement – Non-Technical Summary
- Environmental Impact Statement – Main Report
- Environmental Impact Statement – Figures
- Environmental Impact Statement – Appendix
- Natura Impact Statement
- Compulsory Purchase Order
- CPO Schedule
- Deposit Map A
- Deposit Map B
- Deposit Map C
- Deposit Map D
- Deposit Map E
- Deposit Map F
- EIA Advert
- CPO Advert
- Compulsory Acquisition of Land N69 Listowel Bypass Road Improvement Scheme Compulsory Purchase Order of 2017
Contact Us
Room 115
Co.Buildings
Rathass, Tralee,
Co. Kerry
Tel: 066/7183588
Email: [email protected]